Underground Power Cables - District Office Dasoupoli

 

The measurements were performed on the 10th of December 2009 at 12:10 pm during clear weather conditions. The EMF measurements were performed in the area located above the underground cable “District Office – Dasoupoli”. The following figures provide pictures of the area where EMF measurements were recorded.

Underground cable Dasoupoli
Mykinon Street-Underground cable

The underground cable is rated at a nominal voltage of 132.6 kV and a maximum current capacity of 320A. At the time when the measurements were performed, the load of the underground cable was 91 A which represents the 28.46% of its maximum current capacity.

Limiting exposure values have been provided by the ICNIRP recommendations and are guidelines to many countries and organizations. The exposure limits at 50 Hz are tabulated in the following table according to the limits given by ICNIRP.

Reference levels for Occupational exposure ICNIRP

Frequency

Electric Field Strength, E (V/m)

Magnetic Field Strength, H (A/m)

Magnetic Flux Density, B (µT)

50 Hz

10000

400

500

Reference levels for General Public exposure ICNIRP

Frequency

Electric Field Strength, E (V/m)

Magnetic Field Strength, H (A/m)

Magnetic Flux Density, B (µT)

50 Hz

5000

80

100

Table 1: ICNIRP exposure limits for Occupational and General Public exposure

The maximum obtained values are represented below and compared to the ICNIRP specified limits of General Public standards. The highest magnetic field was observed above the underground cable, with a value 2.62 μT (7.5 m away from the starting point) and a percentage of 2.62 % as compared to the ICNIRP General Public standard 

Maximum magnetic field measurement located along the underground cable

The following table summarizes the highest recorded measured values.

Maximum Magnetic Field Measurements 

Measurement Point 

Maximum Magnetic Field (µT) at Z Height (m)
Percentage of ICNIRP General Public Standard (%)

0.3m

ICNIRP %

1 m

ICNIRP %

1.75 m

ICNIRP %

Measurements along the underground cable

15m Measurement Line

2.62

2.62%

1.25

1.25%

0.87

0.87%

Measurements across the underground cable

4m Measurement Line

1.32

1.32%

0.76

0.76%

0.60

0.60%

Table 2: Maximum Field Measurements