Substation Petros Eliades

 

The measurements were performed for the Petros Eliades distribution substation located in Nicosia on the 22th of July 2009 at 15:00 pm.

pe200709_1 pe200709_2

Figure 1: Substation back side

Figure 2: Underground cable-Front side

The substation is rated at a nominal power of 600 KVA. At the time when the measurements were performed, the substation load power was recorded as:


Red Phase

Yellow Phase

Blue Phase

209 A

181 A

180 A

Table 1: Measured load current


The resultant load of all three phases was 22.8 % utilization of the nominal load current.

Limiting exposure values have been provided by the ICNIRP recommendations and are guidelines to many countries and organizations. The exposure limits at 50 Hz are tabulated in the following table according to the limits given by ICNIRP.

Reference levels for Occupational exposure ICNIRP

Frequency

Electric Field Strength, E (V/m)

Magnetic Field Strength, H (A/m)

Magnetic Flux Density, B (µT)

50 Hz

10000

400

500

Reference levels for General Public exposure ICNIRP

Frequency

Electric Field Strength, E (V/m)

Magnetic Field Strength, H (A/m)

Magnetic Flux Density, B (µT)

50 Hz

5000

80

100

Table 2: ICNIRP Exposure limits for Occupational and General Public exposure

The maximum obtained values are represented below and compared to the ICNIRP specified limits of General Public standards. The highest magnetic field value outside was observed 0m away from the front side of the distribution transformer, with a value 6.84 μT (2 m away from the starting point) and a percentage of 6.84 % as compared to the ICNIRP General Public standard.

Outside Field Measurements

Distance from Side /m

Maximum Magnetic Field at Z Height /m - Percentage of ICNIRP General Public Standard /%

0.3m

ICNIRP %

1m

ICNIRP %

1.75m

ICNIRP %

Outside Substation Field Measurements - Front side

0m

6.84

6.84%

3.38

3.38%

4.48

4.48%

1m

0.8

0.80%

0.49

0.49%

0.54

0.54%

2m

0.27

0.27%

0.37

0.37%

0.16

0.26%

3m

0.74

0.74%

0.3

0.30%

0.18

0.18%

Outside Substation Field Measurements - Left side

0m

1.92

1.92%

2.04

2.04%

1.91

1.91%

1m

0.38

0.38%

0.47

0.47%

0.35

0.35%

2m

0.15

0.15%

0.37

0.37%

0.14

0.14%

Outside Substation Field Measurements - Right side

0m

1.29

1.29%

2.46

2.46%

2.08

2.08%

1m

0.32

0.32%

0.28

0.28%

0.32

0.32%

2m

0.11

0.11%

0.14

0.14%

0.12

0.12%

Outside Substation Field Measurements - Back side

0m

2.98

2.98%

1.51

1.51%

1.24

1.24%

1m

0.28

0.28%

0.02

0.20%

0.2

0.20%

Table 3: Magnetic Field Measurements in the outside area