Power Station - EAC Vasilikos Power Station

On the 6th of February 2008 at 9:00 am electric and magnetic field measurements were performed for EAC Vasilikos Power Station.

Limiting exposure values have been provided by the ICNIRP recommendations and are guidelines to many countries and organizations. The exposure limits at 50 Hz are tabulated in the following table according to the limits given by ICNIRP.

 

Reference levels for Occupational exposure ICNIRP

Frequency

Electric Field Strength, E (V/m)

Magnetic Field Strength, H (A/m)

Magnetic Flux Density, B (µT)

50 Hz

10000

400

500

Reference levels for General Public exposure ICNIRP

Frequency

Electric Field Strength, E (V/m)

Magnetic Field Strength, H (A/m)

Magnetic Flux Density, B (µT)

50 Hz

5000

80

100

Table 1: ICNIRP exposure limits for Occupational and General public exposure

The obtained results for the RMS fields inside and outside the power station are shown in tables 2, 3 and 4 respectively. A comparison is also made with the ICNIRP recommendations.

Vasilikos Power Station: Magnetic Fields Inside Power Station

Measurement Point

Maximum Magnetic Field / µT at Z Height /m -

Percentage of ICNIRP Occupational Standard /%

0.3m

ICNIRP %

1 m

ICNIRP %

1.75 m

ICNIRP %

Inside the Central Control Room

Measurement Point A

0.39

0.07%

----

----

----

----

Measurement Point B

----

----

0.34

0.07%

----

----

Measurement Point C

0.66

0.13%

----

----

----

----

Power Generator 1

Measurement Point A

10.50

2.10%

9.16

1.83%

8.28

1.65%

Measurement Point B

157.10

31.42%

169.00

33.80%

148.10

29.62%

Measurement Point C

56.12

11.22%

101.30

20.26%

104.90

20.98%

Measurement Point D

33.85

6.77%

39.19

7.83%

35.77

7.15%

Measurement Point E

43.30

8.66%

113.80

22.76%

93.50

18.70%

Measurement Point F

------

------

108.70

21.74%

------

------

Measurement Point G

62.68

12.53%

44.74

8.94%

63.94

12.78%

Measurement Point H

62.70

12.54%

132.00

26.40%

99.60

19.92%

Excitation Transformer Area

Measurement Point A

1.75

0.35%

1.773

0.35%

1.79

0.35%

Measurement Point B

16.10

3.22%

14.23

2.84%

12.44

2.48%

Measurement Point C

------

------

23.82

4.76%

------

------

Measurement Point D

------

------

7.07

1.41%

------

------

Measurement Point E

292.00

58.40%

183.8

36.76%

192.80

38.56%

Measurement Point F

31.60

6.32%

22.3

4.46%

19.63

3.92%

Measurement Point G

38.44

7.68%

22.72

4.54%

26.21

5.24%

132kV GIS Area

Measurement Point A

------

------

18.83

3.76%

------

------

Measurement Point B

30.87

6.17%

------

------

------

------

Measurement Point C

------

------

948.60

189.72%

------

------

Measurement Point D

17.02

3.40%

------

------

------

------

Measurement Point E

923.90

184.78%

------

------

------

------

Measurement Point F

75.70

15.14%

------

------

------

------

Measurement Point G

5.10

1.02%

------

------

------

------

Measurement Point H

------

------

134.60

26.92%

------

------

Measurement Point I

26.28

5.25%

------

------

------

------

Inside the GIS Control Room

Measurement Point A

----

----

2.79

0.56%

----

----

Measurement Point B

----

----

2.20

0.44%

----

----

Measurement Point C

1.30

0.26%

----

----

----

----

Moni 2 - 81 AEB 18 and 16AB25

Measurement Point A

----

----

6.15

1.23%

----

----

Measurement Point B

----

----

34.66

6.93%

----

----

Measurement Point C

4.27

0.85%

3.68

0.73%

----

----

Measurement Point D

----

----

3.37

0.67%

----

----

Measurement Point E

----

----

----

----

9.05

1.81%

Measurement Point F

----

----

----

----

0.76

0.15%

Electricians Room and Kitchen

Measurement Point A

4.98

0.99%

6.10

1.22%

7.33

1.46%

Measurement Point B

----

----

3.28

0.65%

----

----

Measurement Point C

----

----

1.48

0.29%

----

----

Measurement Point D

----

----

----

----

2.82

0.56%

Measurement Point E

----

----

1.39

0.27%

----

----

Measurement Point F

----

----

2.23

0.44%

----

----

Table 2: Maximum Magnetic Field measurements inside power station

 

Measurements inside Vasilikos Power Station- Devices

Inside the Workshop

Device

Magnetic Field/µT-Percentage of ICNIRP Occupational Standard /%

Measurements on Device Parts

ICNIRP %

Plasma Cutter

1.65

0.33%

KEMPPI TIG 410

2.54

0.50%

TG 2500

526.70

105.34%

Table 3: Measurements on Devices inside the Vasilikos Power Station and ICNIRP Occupational Standard

 

Vasilikos Power Station: Magnetic Fields Outside Power Station

Measurement Point

Maximum Magnetic Field / µT at Z Height /m -

Percentage of ICNIRP Occupational Standard /%

0.3m

ICNIRP %

1 m

ICNIRP %

1.75 m

ICNIRP %

Generator Transformer 1

Measurement Point A

275.70

55.14%

339.40

67.88%

280.50

56.10%

Measurement Point B

24.27

4.85%

13.53

2.70%

14.32

2.86%

Measurement Point C

----

----

8.85

1.77%

----

----

Measurement Point D

22.15

4.43%

28.80

5.76%

26.29

5.25%

Measurement Point E

10.62

2.12%

10.97

2.19%

10.00

2.00%

Unit Transformer

Measurement Point A

8.77

1.75%

5.02

1.00%

6.97

1.39%

Measurement Point B

301.00

60.20%

312.00

62.40%

213.40

42.68%

Measurement Point C

50.66

10.13%

16.24

3.24%

12.11

2.42%

Measurement Point D

3.42

0.68%

3.21

0.64%

3.00

0.60%

Parking Area

Measurement Point A

2.66

0.53%

----

----

----

----

Measurement Point B

1.73

0.34%

1.63

0.32%

1.50

0.30%

Table 4: Maximum Magnetic Field measurements outside power station

Accordingly the Electric Field measurements taken both inside and outside the power station are summarized in the following tables.

Vasilikos Power Station: Electric Fields inside Power Station

Measurement Point

Maximum Electric Field (kV/m) at Z Height /m -

Percentage of ICNIRP Occupational Standard /%

0.3m

ICNIRP %

1 m

ICNIRP %

1.75 m

ICNIRP %

132kV GIS Area

Measurement Point J

------

------

------

------

0.0008

0.0087%

Table 5: Electric Field measurements inside Vasilikos Power Station

Vasilikos Power Station: Electric Fields outside Power Station

Measurement Point

Maximum Electric Field (kV/m) at Z Height /m -

Percentage of ICNIRP Occupational Standard /%

0.3m

ICNIRP %

1 m

ICNIRP %

1.75 m

ICNIRP %

Generator Transformer 1

Measurement Point F

------

------

------

------

0.0051

0.0514%

Unit Transformer

Measurement Point E

------

------

------

------

0.0008

0.0086%

Measurement Point F

------

------

------

------

0.0007

0.0075%

Table 6: Electric Field measurements outside Vasilikos Power Station

At the time when the measurements were performed the load of the unit transformer, which is rated at a nominal power of 14.5 MVA, was recorded as 6.6 kV and 601 A. From the resultant load we note that the utilization is only 48% of the nominal load (14.5 MVA Transformer).

Furthermore the Generator transformer which is rated at a nominal power of 130 MW had a load at the time when the measurements were performed of 120 MW. From the resultant load we note that the load is 92% of the nominal load for this transformer.